In 2021, Inpex performed their first major maintenance campaign at their Ichthys onshore LNG facility, and Winnellie Hydraulics was…
September 3, 2021
In 2021, Inpex performed their first major maintenance campaign at their Ichthys onshore LNG facility, and Winnellie Hydraulics was…
When the assembly of flanged joints requires a high level of accuracy, it is industry best practice to utilise…
Our mining client required a full overhaul of their CAT 785B front strut following a premature failure of the…